1. Home
  2. Method

M-00The Smartech Standard

Designed before installed.

Four steps, each with something you can hold: survey notes, drawings, a locked scope and an as-built set. Here is what each one produces and why it keeps change orders out.

Smartech CAD drawing of a campus security layout
Smartech CAD drawing from a campus project · client withheld

SHT-02Four steps

Survey. Design. Lock. Install.

  1. 01

    Survey

    We walk every site before we price it: doors, ceilings, closets, existing devices, cable paths and the people who will use the system.

    • Site survey notes and photos
    • Existing device inventory
    • Questions for your IT and facilities teams
  2. 02

    Design

    Every device goes on the drawing with its location, coverage and connection, so you can see what you are buying before you buy it.

    • Device layout drawings
    • Camera field-of-view studies
    • Riser and network diagram
  3. 03

    Lock the scope

    One device schedule, one bill of materials and one written scope with its exclusions. What is not on paper is not assumed.

    • Device schedule and line-item BOM
    • Written scope with exclusions
    • Schedule and phasing by site
  4. 04

    Install & close out

    We install what the drawing says, test it with you and hand over a system your team can run and the next technician can read.

    • As-built drawings
    • Programming and IP records
    • Closeout package and training

SHT-03Locked scope

What “locked scope” means.

A locked scope is three documents that agree with each other: the drawings, the device schedule and the written scope. Every device on the drawing is a line on the schedule; every line on the schedule is priced; everything not on them is listed as an exclusion or an assumption.

After that, a change is a decision you make, priced before it happens. It is not a discovery on site. In Smartech's own words, “we refuse to accept mediocrity or rely on unnecessary change orders”.

How to keep change orders out of a security project

“scope accurately, standardize solutions and deliver predictable outcomes”

What the market values in integrators · SDM, 2026 Top Systems Integrators

SHT-04The drawing

The drawing is the contract.

Switch the layers. Each device you see is a priced line in the schedule beside it.

Sample campus floor plan with video, access control, intrusion and intercom layers SHT-04 · SAMPLE CAMPUS · LEVEL 1SCALE 1:200 · SAMPLE CLASS 101CLASS 102CLASS 103CLASS 104CLASS 105 FRONT OFFICECLINICVEST.MEDIA CTRCAFETERIA CORRIDORDROP-OFF
Device scheduleSHT-04
CAM-DFixed dome camera6
CAM-PPTZ camera, exterior1
RDRCard reader + electrified lock5
ACPAccess control panel1
PIRMotion detector3
DCExterior door contact4
INTVideo intercom, entry station1
MSTMaster station, front office1
Devices on this sheet0

Sample drawing for illustration. Your review gets drawings of your own sites.

SHT-05On paper and on site

Drawings first, then the field.

Access control floor plan
Design · access control plan for a store · client withheld
Technician mounting a dome camera in a ceiling
Install · the camera goes where the drawing says
Cabinet with controllers in rows and labeled wiring
Close out · a cabinet the next technician can read

SHT-06Why it works

What buyers ask for, in their words.

“I’m also hoping they’re going to draw out information that perhaps I hadn’t even thought about”

Eric Clay, CoxHealth · TechDecisions, 2020

“Start gathering documents sooner rather than later.”

Jason Mehlhaff, senior project manager, Layton Construction · Construction Dive, 2018

Industry voices quoted from published interviews. They describe what buyers ask of integrators; they are not reviews of Smartech.

SHT-09Project review

See the method on your own sites.

A free project review: we look at your sites, your current system and your timeline, then tell you what we would design, phase and lock in writing. We reply within 24 business hours.