A low-voltage sub with drawings.
Smartech works under general contractors on new builds and renovations: coordinated drawings before rough-in, a schedule you can hold us to, and a closeout package that does not hold up yours.
SHT-02On your job
What we bring to your schedule.
- GC-01Bid-stage reviewDrawings and specs read early, with RFIs before the bid, not after award.
- GC-02Coordinated drawingsDevice layouts and risers coordinated with electrical and door hardware.
- GC-03Rough-in coordinationBoxes, conduit and backing where our devices need them, on time.
- GC-04Manpower by phaseA crew plan that follows your schedule, not ours.
- GC-05Testing with the ownerSystems demonstrated and accepted with the owner's team.
- GC-06Closeout packageAs-builts, device lists, programming records and training sign-off.
SHT-03Closeout
Closeout starts at the beginning.
Retainage is released when closeout is complete, and security is often one of the last trades to finish. So we build the closeout package as we go: drawings updated as devices go in, programming recorded as it is done, training scheduled before the punch list, not after.
Florida law treats the bid itself as contracting: the attempted sale of contracting services and the negotiation or bid for a contract on these services also constitutes contracting. Ask every low-voltage sub for its license number with the bid. Ours is EG13000538.
Source: Florida Statutes 489.505.
“Start gathering documents sooner rather than later.”
Industry voices quoted from published interviews. They describe what buyers ask of integrators; they are not reviews of Smartech.
SHT-04How we work with you
From bid documents to closeout.
- 01
Bid review
We read the security drawings and specs, flag gaps and send RFIs.
- Questions and clarifications
- Line-item proposal with exclusions
- 02
Coordination
Our drawings meet electrical, door hardware and IT before rough-in.
- Coordinated device layouts
- Rough-in requirements by trade
- 03
Install
Crews follow your phasing, with daily progress you can see.
- Manpower plan by phase
- Progress reports
- 04
Closeout
Testing with the owner, training and the documents your closeout needs.
- As-builts and device lists
- Training sign-off
SHT-05Questions
What GCs ask a security sub.
Are you licensed for the work?
Florida Certified Alarm System Contractor II, EG13000538, current through August 31, 2028. Verify it on DBPR.
Do you do fire alarm?
No. Class II covers all types of alarm systems other than fire. We coordinate with your fire alarm sub where systems meet.
Do you register as a subcontractor with us, or do we register with you?
Both happen. Send your prequalification forms to contact@smartechsecurity.com. Trades that want to work with Smartech can use the subcontractor registration.