Inherited a system? The first 30 days

Inheriting a system nobody documented is common. An audit in the first weeks turns it into something you can support, budget and improve.

Changing integrators is rarely a clean handover. The new team inherits devices, panels and programming with whatever documentation the last one left, which is often very little. The first month decides whether the system becomes supportable or stays a mystery.

Signs it is time to switch

  • Nobody has current drawings of what is installed.
  • Only the previous integrator can add a credential or export footage.
  • Cabinets are unlabeled and nobody wants to open them.
  • Every proposal leads back to the same single product line.

“Or there was just one product line they were selling and when I wanted to look at others they were unwilling and that destroyed the relationship.”

Paul Sarnese, Virtua Health · Security Sales & Integration, 2022

Week 1: access and inventory

Start with what you need to operate the system without anyone's permission:

  • Administrator credentials for recorders, video software, access control and intrusion panels.
  • Software licenses and support contracts, and whose name they are in.
  • A device list: every camera, reader, panel and intercom, with its location and address.

Week 2: condition

Then open the cabinets. Look at how controllers are mounted, whether runs are labeled, how power and data are routed, which firmware is running and whether recording actually meets the retention the organization expects.

Access control cabinet with loose controllers and tangled, unlabeled wiring
Before: a cabinet as a previous integrator handed it over. Real job photo, client withheld. See the after.

Weeks 3–4: the written report

The audit ends in writing, with three lists and a price for each:

  • Keep: what works and can be supported as is.
  • Fix now: what is unsafe, unsupported or blocking operations.
  • Plan: what should be replaced over the next budget cycles.

Make sure you own your system

Whoever takes over, the owner should end the month holding the administrator credentials, the software licenses, the drawings and the device list. Then the next change of integrator, if there ever is one, takes days instead of months.

Documentation is easiest to collect at the start, a lesson from construction closeout that applies here too: “Start gathering documents sooner rather than later.”

Smartech service & support covers takeovers, remote video retrieval and credential management.

SHT-09Project review

Bring your drawings. Leave with a plan.

A free project review: we look at your sites, your current system and your timeline, then tell you what we would design, phase and lock in writing. We reply within 24 business hours.