Skip to content
ENES Prequalification

F·01Projects

With the exact role, or not at all.

Every project enters this page with its sheet: who the client was, what was built, what TecnoPower did and which document proves it. If a fact cannot be proven, the sheet waits.

Engineering archive with rolled drawings and as-built binders on steel shelves
Fig. 01TecnoPower

F·02How to read a project sheet

How to read a project sheet

The same structure for every project, so your committee can compare without asking for clarifications.

Sheet · TemplateTP
Project
Name and location of the works.
Client
Owner of the works, published with their permission.
Scope
What was built: voltage, length, number of bays.
TecnoPower’s role
EPC contractor, subcontractor to whom, or project management.
Year and status
Start, handover and actual status with an as-of date.
Document
Contract, handover certificate or client letter.

F·03Three sheets in preparation

Three sheets in preparation

These sheets go live once their document is in the file.

Sheet 01In preparation
Type of work
Transmission and substations
Project
to be confirmed
Client
to be confirmed
Scope
to be confirmed
TecnoPower’s role
to be confirmed
Year and status
to be confirmed
Document
to be confirmed
Sheet 02In preparation
Type of work
Subsea and underground cable
Project
to be confirmed
Client
to be confirmed
Scope
to be confirmed
TecnoPower’s role
to be confirmed
Year and status
to be confirmed
Document
to be confirmed
Sheet 03In preparation
Type of work
Technical procurement
Project
to be confirmed
Client
to be confirmed
Scope
to be confirmed
TecnoPower’s role
to be confirmed
Year and status
to be confirmed
Document
to be confirmed

Need references for your committee?

Full sheets and reference contacts are in the prequalification package, with each client’s permission.

Request the prequalification package
Request prequalification