Three capabilities in high voltage.

Engineering, procurement and construction for the line, the substation and the cable that crosses the water. Every project is documented with TecnoPower’s exact role.

Cut end of a high-voltage cable showing its copper core
Fig. 01TecnoPower

F·02How we document it

Every project, with its exact role.

  • A responsibility matrix: who does what between the manufacturer, civil works, erection and protection.
  • A schedule with the outage windows agreed with the grid operator.
  • Signed test protocols and as-built drawings.
  • A project sheet with TecnoPower’s exact role.

Ask for the proof file before you invite us.

A short form. We send the prequalification package and introduce the person who would lead your project.