Skip to content
ES Prequalification

PA · For: Transmission managers at state utilities

Panama:repowering what exists

Substation repowering, protection and control, and power-cable work.

USD 167 M

ETESA investment program this year

Source · Panamá América · 2026-08-17

ETESA runs a USD 167 million investment program and prefers repowering existing lines over building new ones; its manager says repowering maximizes resources and minimizes risk. The interconnection with Colombia will include 120 km of submarine cable out of its 500 km.

What prequalificationrequires

  • Repowering existing assets before opening new lines (ETESA).
  • Submarine cable documented joint by joint: the link to Colombia adds 120 km under the sea.
  • Own experience: with multilateral lenders, affiliates and partners do not count (World Bank, §6.21).

In-countryreferences

No reference of its own published in this country. GS&E can work here with a local partner, and the offer will say so.

Request our filebefore the tender closes.

Registration, job sheets with role and year, credentials and compliance in one package. We reply on business days.

Phone  +1 (786) 348-2001Email  contact@globalse.net

Start here

This field is required.

This field is required.

This field is required.

We take you to the form with these details filled in.