How we work
Six steps,one file that grows.
Every step leaves a signed document. At the end, the client receives the job and the file that proves it.
-
Step 01
Prequalificationand scope
We define which part of the scope GS&E takes on, with which partners and under which authorizations. The role is written down before pricing.
Document it leavesScope and responsibility matrix
-
Step 02
Basic and detailedengineering
To IEC, IEEE and ANSI standards, and reviewed with the grid operator.
Document it leavesConstruction drawings and specifications
-
Step 03
Procurementfrom the U.S.
From Doral we compare technical bids, witness factory tests and follow every order to the port.
Document it leavesFAT reports and manufacturing schedule
-
Step 04
Heavy-equipmentlogistics
Route survey, permits, transport, lifting and impact recording for heavy equipment.
Document it leavesLifting plan and receipt record
-
Step 05
Installation andcommissioning
Installation supervision, site testing and energization with signed protocols. In the U.S., electrical work is performed by a licensed contractor.
Document it leavesSAT records and energization record
-
Step 06
Close-outand file
As-built drawings, manuals, warranties and the client’s reference letter for the next prequalification.
Document it leavesHandover record and reference letter
ITP · HSE · ISO
Quality and safety,with numbers
Inspection and test plan
Every job has its ITP: what is inspected, when, against which criteria and who signs.
VerifiedHSE metrics
Man-hours, TRIR and EMR with period and source.
To confirmISO certifications
Published only with number, issuer and expiry date.
To confirm
Request our filebefore the tender closes.
Registration, job sheets with role and year, credentials and compliance in one package. We reply on business days.