Sheet 03 · 138 – 400 kV
Protectionand control
Line, busbar and transformer protection schemes, substation control and teleprotection.
When a fault lasts a few milliseconds too long, the damage multiplies. Protection schemes are designed, set and tested by injection before a single piece of equipment goes into service.
What the workincludes
- Short-circuit and protection coordination studies.
- Differential (87), distance (21) and overcurrent (50/51) protection.
- Standardization of schemes on existing lines.
- Substation control and teleprotection links.
- Secondary injection and end-to-end testing.
The questionwe hear most
“Are your settings coordinated with the rest of the grid?”
The study starts from the grid operator’s data and is submitted for review before a single setting is loaded into the relays.
Request our filebefore the tender closes.
Registration, job sheets with role and year, credentials and compliance in one package. We reply on business days.

